Reference Project Mali

Customer: ECM Sarl (Energy Company of Mali)

Technical, economic, financial, environmental and social feasibility study for photovoltaic systems of 40 MWp in Kambila and 50 MWp in Safo” in Mali.

  1. Grid and grid stability studies (including but not limited to the study of
    short-circuit currents, load studies, power quality studies, stability studies, including grid connection costs and barriers) ;
  2. The stability study of the national interconnected grid (NVN).
    – Calculation of the load flow :
    o Normal operation established,
    o Evaluation of short-circuit currents.– Dynamic behaviour:
    o static stability,
    o Transient stability.
    – Analysis of harmonics.
  3. connection to the network.
    – Analysis of the existing load in the vicinity of the selected sites, taking into account the specifications of the network in that area ;
    – Connection requirements;
    – Analysis of the influence of PV power plants on the grid, especially on voltage, frequency,
    harmonics, fluctuations, etc.
  4. Dynamic study essentially aims at the following points:
    – Validation of the capacity maximum exchange capacity included in the static study ;
    – Analyzes of network security to determine strategies to maintain acceptable operating conditions during normal operation and to secure the system during a failure.
    – Assessment of transient stability, which aims to verify the immunity of the network to strong disturbances being tested by
    Disorders of different types and accordingly
    mainly to faults three-phase interference, loss of a power unit production loss, transmission line loss and load loss.
    – Assessment of the stability statics of the interconnected electrical system with a view to assessing its stability in the event of small disturbances

Reference Project Niger

Customer: Nigelec (Society for Energy of Niger/ Gorou Banda)

Study on the connection of a 20MW battery storage system to a mast system HV station and design of a MV station with existing connection (connection of a 20MW battery storage system to the 66kV or 130kV grid)”. HV station and design of a MV station with existing grid connection in 66kV or 130kV) in Niger

Detailed technical planning of the grid connection
of 20MW battery storage from LV/MV transformer to MT transformer. MS to HS connector.

  • Detailed design and description of electrical plant equipment and protection systems (except LV/MV transformer)
  • Sizing the cables and estimating theirs
    length
  • Detailed description of the MS station
  • Description of the required updates for the Scada existing
  • Validation with the customer’s field team that the solution proposed is workable

Our reference projects from Europe

Network Modeling & Network Calculation ( PSS Sincal )

Customer: E.ON Deutschland AG

  • Carrying out a network compatibility assessment (NVP)
  • Technical advice regarding the next possible NVP of the feed-in plants
  • Preparation of concepts for network reinforcement measures.
  • Recording of the essential input parameters
  • Testing of the NS network model
  • Execution of the reconciliation of different primary data sources (GIS, feed-in database)

Planning the distribution network ( PSS Sincal )

Customer: Schleswig-Holstein Netz AG

  • Execution of the reconciliation of different primary data sources (GIS, feed-in database)
  • Testing of the NS network model
  • Recording of the essential input parameters
  • Preparation of concepts for network reinforcement measures.
  • Technical advice regarding the next possible NVP of the feed-in plants
  • Carrying out a network compatibility assessment (NVP)

Fernwirktechnik mit Software PSIcontrol und PSIprins

Customer: PSI SOFTWARE AG

  • Analysis of the customer’s telecontrol lines for technical changes and errors based on existing requirements and messages that are stored in Jira
  • Concept creation for the implementation of the analyzed changes or errors, in particular the protocols IEC870, IEC61850, TASE.2, OPD-DA, OPC-UA, SINAUT, Modbus
  • Extraction of data from the transmission logs
  • Adaptation or renewal in PSIcontrol or PSIprins for transfer to the end customer’s control systems and their testing
  • Analysis of error messages in Jira regarding functional defects in data transfer
  • Correction of errors in PSIcontrol or PSIprins for transfer to the customer’s control systems and their testing
  • Creation of technical documentation
  • Participation in weekly meetings of the FWT specialist team for status comparison

Do you need competent support for the planning and implementation of your power grids ?