FYK – Power Engineering is proud of the projects it has completed:
Our reference projects from Africa
01.
REFERENCE PROJECT MALI
Customer: EDM Sarl (Energy Company of Mali)
- Grid and grid stability studies (including but not limited to the study of
short-circuit currents, load studies, power quality studies, stability studies, including grid connection costs and barriers) ; - The stability study of the national interconnected grid (NVN).
– Calculation of the load flow :
o Normal operation established,
o Evaluation of short-circuit currents.
– Dynamic behaviour:
o static stability,
o Transient stability.
– Analysis of harmonics. - connection to the network.
– Analysis of the existing load in the vicinity of the selected sites, taking into account the specifications of the network in that area ;
– Connection requirements;
– Analysis of the influence of PV power plants on the grid, especially on voltage, frequency,
harmonics, fluctuations, etc. - Dynamic study essentially aims at the following points:
– Validation of the capacity maximum exchange capacity included in the static study ;
– Analyzes of network security to determine strategies to maintain acceptable operating conditions during
during normal operation and to secure the system during a failure.
– Assessment of transient stability, which aims to verify the immunity of the network to strong disturbances being tested by
Disorders of different types and accordingly
mainly to faults three-phase interference, loss of a power unit production loss, transmission line loss and load loss.
– Assessment of the stability statics of the interconnected electrical system with a view to assessing its stability in the event of small disturbances
02.
REFERENCE PROJECT NIGER
Customer: Nigelec (Society for Energy of Niger/ Gorou Banda)
Detailed technical planning of the grid connection
of 20MW battery storage from LV/MV transformer to MT transformer. MS to HS connector.
- Detailed design and description of electrical plant equipment and protection systems (except LV/MV transformer)
- Sizing the cables and estimating theirs
length - Detailed description of the MS station
- Description of the required updates for the Scada existing
- Validation with the customer’s field team that the solution proposed is workable
Our reference projects from Europe
01.
Network Modeling & Network Calculation ( PSS Sincal )
Customer: E.ON Deutschland AG
- Carrying out a network compatibility assessment (NVP)
- Technical advice regarding the next possible NVP of the feed-in plants
- Preparation of concepts for network reinforcement measures.
- Recording of the essential input parameters
- Testing of the NS network model
- Execution of the reconciliation of different primary data sources (GIS, feed-in database)
02.
Planning the distribution network ( PSS Sincal )
Customer: Schleswig-Holstein Netz AG
- Execution of the reconciliation of different primary data sources (GIS, feed-in database)
- Testing of the NS network model
- Recording of the essential input parameters
- Preparation of concepts for network reinforcement measures.
- Technical advice regarding the next possible NVP of the feed-in plants
- Carrying out a network compatibility assessment (NVP)
MUNICIPAL PUBLIC SERVICES
Description of the project:
– Modernization of medium voltage switchgear
– Duration of the project 5 months (2015)
Description of the project:
– Extension of the existing device
– Modernization of the plant
– Connection of new stations customers
– Duration of the project: 5 months (2017)
Description of the project:
Localization / notification of
ground fault
– Duration of the project: 2 months (2017)
Description of the project:
New connection of the medium-voltage grid to the high-voltage grid
132kV via new transformers
4x50MVA
– Duration of the project: 2 years (2014-2016)
Description of the project:
– Evaluation of the concept for
Power protection power for
the entire MS & LV network
– Duration of the project: 2 years (2016 – 2018)
Description of the project:
connection
a new gas turbine from
15MVA
– Duration of the project: 1 year (2018 to 2019)
INDUSTRY CUSTOMERS
CONTROL TECHNOLOGY
Description of the project:
– Creation and connection of a new control system of substations with IEC 60870-5-104
– Duration of the project: 6 months (2019)
Description of the project:
Extension of a field and station control system with IEC 61850
– Duration of the project: 1 year (2019 – 2020)
Description of the project:
New combination of field control and station technology with IEC 60870-5-101 and IEC 60870-5-104
– Duration of the project: 6 months (2019)
UA Marxheim
Description of the project:
New construction, increase in performance and
Increasing the power in the event of a short circuit
– Duration of the project: 2 years (2017 – 2019)
UA Sossenheim Ost
Description of the project:
new construction,
Provision of the project for a data center data center by Cyrus One
– Duration of the project: 1 year (2019 – 2020)
UA FWH Ost
Description of the project:
Increase in performance and
increase in performance
short circuit
– Duration of the project: 2 years (2015 – 2017)